11. Blade material: SUS304
Note:
1. Before installation, please confirm the power voltage to avoid damage to the motor.
2. Do not install under the feed inlet to avoid direct impact of materials.
3. For horizontal installation, please put the inlet port vertically downward; for vertical installation, please wire the external wire downward and lock the cover of the inlet connector and junction box, so as to avoid infiltration of rainwater and other foreign matters that may affect the normal use of the product.
4. During horizontal installation, the material level switch can be tilted horizontally downward 15°~20° to reduce material accumulation.
5. For the low horizontal installation of large silos, please install the protective baffle. A semi-circular pipe (with a radius of about 150mm) longer than 50mm of the rotary stop switch can be used to fix (weld) the pipe 250MM above the material level switch.
Contact: Miss Zhang
Phone: 18816633390
Tel: 0532-86888236
Email:
Add: No.7, Siliu Middle Road , Licang District, Qingdao City, Shandong Province, China